Get a quote

Merton · England

EICR (Electrical Safety Report) in Merton

From enquiry to certificate: EICR (Electrical Safety Report) for landlords in Merton, handled by professionals holding the registration the law requires, with pricing confirmed before you commit.

Get your quote

Straight answer

An EICR is the formal condition report on a property's fixed wiring, tested against BS 7671. Rentals in England, Scotland and Wales must hold a satisfactory report renewed at least every 5 years; Northern Ireland currently has no equivalent general duty for private lets. Either way, the report is how a landlord in Merton evidences the installation is safe.

Booking

How it works

Our network doesn't yet show confirmed availability in Merton. Rather than guess, tell us what the property needs and we'll come back with a real answer — coverage, timing and price — before you decide anything.

Check availability & pricing

Guidance only — not a quote. Final price confirmed before any booking.

Pricing

What an EICR costs

Guidance range
£120–£250
per report. Guidance only — not a quote. Final price confirmed before any booking.
Time on site
Roughly 1–4 hours depending on property size and the number of circuits.
Renewal
Every 5 years
The report itself can specify a shorter interval if the installation's condition warrants it — the date on your report governs.

Expect pricing by property size as a proxy for circuit count: studios and small flats at the lower end, larger houses higher. If a quote looks dramatically cheap, check the schedule of test results is included and remedial pricing is transparent. The figures here are guidance for budgeting, confirmed properly before any visit.

Paperwork

Copies, deadlines and remedial evidence

In England the report comes with deadlines attached: copies to existing tenants within 28 days, to new tenants before occupation, to prospective tenants within 28 days of a request, and to London Borough of Merton within 7 days if asked. Unsatisfactory results add another: remedial work within 28 days — or sooner if the report says so — with written confirmation kept alongside the report.

Credentials

Who you're letting in

EICR isn't a protected task, which is exactly why vetting matters: anyone can buy a pad of forms. Our bar is demonstrable competence — recognised qualifications, scheme registration, calibrated instruments, insurance — checked before a booking is confirmed, not after a dispute.

The law

What the law asks of landlords in Merton

England's 2020 regulations put teeth behind the EICR: councils — London Borough of Merton locally — can demand a copy within 7 days, require written confirmation of remedials, and issue penalties of up to £30,000 per breach. In Scotland the duty lives in the Repairing Standard; in Wales, the Renting Homes (Wales) regime. Northern Ireland is the exception, with no equivalent blanket requirement yet.

England
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
Private landlords must have the fixed electrical installation inspected and tested at least every 5 years by a qualified and competent person, give the report to tenants within 28 days (and to new tenants before they occupy), supply it to the council within 7 days if asked, and complete any remedial work within 28 days.
Scotland
Housing (Scotland) Act 2014 (Repairing Standard)
Private landlords must have an electrical safety inspection at least every 5 years, covering the installation and appliances the landlord provides.
Wales
Renting Homes (Wales) Act 2022 and associated fitness regulations
Landlords must obtain an electrical condition report at least every 5 years and give contract-holders a copy.
Northern Ireland
No equivalent general duty currently in force
There is no blanket 5-yearly EICR duty for private tenancies in Northern Ireland at present, though periodic inspection remains strongly recommended and may be required for HMOs.

Penalties stated are statutory maximums or court-set; London Borough of Merton is the local housing authority for Merton.

For landlords in Merton

Letting in Merton: the practical points

Letting in Merton puts you under the same national wiring standard as everywhere else; the local layer is London Borough of Merton's housing enforcement and any licensing conditions on the property. Licensed HMOs in particular should expect the EICR to be requested and checked, not just held.

The inspection

What the electrician actually tests

Testing runs circuit by circuit. The electrician opens the consumer unit, checks protective devices, earthing and bonding, then dead-tests each circuit — continuity, insulation resistance — before live tests such as earth fault loop impedance and RCD tripping times. Power goes off in stages while this happens. Observations are graded C1, C2, C3 or FI, and those grades, not opinion, decide whether the report is satisfactory.

FAQ

Before you book: quick answers

Who can carry out an EICR in Merton?

A qualified and competent person — in practice an electrician who tests against BS 7671, typically registered with a scheme such as NICEIC or NAPIT. Landlords should ask for evidence of qualifications, scheme membership and insurance before booking.

What are the penalties for not having an EICR?

In England, local authorities such as London Borough of Merton can impose financial penalties of up to £30,000 per breach of the Electrical Safety Standards Regulations 2020. Authorities can also arrange remedial work and recover costs.

How often does an EICR need renewing?

At least every 5 years for rental property in England, Scotland and Wales, or sooner if the report specifies a shorter interval — inspectors can recommend earlier re-inspection where the installation's condition justifies it.

How long does an EICR take?

Usually 2 to 4 hours for a typical flat or house, longer for larger properties or older installations. Power is switched off circuit by circuit during testing, so tenants should expect short interruptions.

What do the C1, C2, C3 and FI codes on an EICR mean?

C1 means danger present, immediate action required. C2 means potentially dangerous, remedial work needed. FI means further investigation required. C3 is an improvement recommendation only. A report with any C1, C2 or FI is unsatisfactory; C3s alone still pass.

Do I need an EICR to sell a property in Merton?

No law requires an EICR to sell, but buyers' surveyors and conveyancers increasingly ask for recent electrical reports, and an unsatisfactory or missing report can slow a sale. For rentals, the letting duty is what matters.

Nearby

Also serving landlords in: Wandsworth · Kingston upon Thames · Sutton · Lambeth · all of London

Tell us the postcode and what needs certifying; we'll handle the rest and keep the renewal on our calendar, not just yours. Tell us about the property

Sorting your EICR (Electrical Safety Report) in Merton?

Tell us the property and we'll confirm coverage and price by email before anything is committed.

Register interest

Register interest — EICR (Electrical Safety Report)