Get a quote

Camden · England

EICR (Electrical Safety Report) in Camden

One short form, and your EICR (Electrical Safety Report) in Camden is in hand — correctly registered professionals, honest pricing guidance, and your certificate stored with its renewal date.

Get this sorted

Straight answer

An EICR is the formal condition report on a property's fixed wiring, tested against BS 7671. Rentals in England, Scotland and Wales must hold a satisfactory report renewed at least every 5 years; Northern Ireland currently has no equivalent general duty for private lets. Either way, the report is how a landlord in Camden evidences the installation is safe.

Booking

How it works

We're building coverage in Camden through our national onboarding programme, and we won't pretend otherwise with a fake availability calendar. Send the property details and we'll confirm by email whether we can cover the job, and the price, before anything is committed.

Check availability & pricing

Guidance only — not a quote. Final price confirmed before any booking.

Pricing

What an EICR costs

Guidance range
£120–£250
per report. Guidance only — not a quote. Final price confirmed before any booking.
Time on site
Roughly 1–4 hours depending on property size and the number of circuits.
Renewal
Every 5 years
The report itself can specify a shorter interval if the installation's condition warrants it — the date on your report governs.

EICR pricing tracks the size and age of the installation: more circuits mean more testing time, and older consumer units or piecemeal past alterations slow things down. Remedial work, if needed, is always a separate, itemised cost — never assume it's included. The range shown is national guidance; your confirmed price comes before booking.

For landlords in Camden

Letting in Camden: the practical points

Nothing about the test itself changes in Camden — BS 7671 is the standard everywhere. What's local is enforcement and licensing: London Borough of Camden is the housing authority, in England councils hold the £30,000 penalty power, and any HMO licence will expect the current satisfactory report among its papers.

Paperwork

Copies, deadlines and remedial evidence

In England the report comes with deadlines attached: copies to existing tenants within 28 days, to new tenants before occupation, to prospective tenants within 28 days of a request, and to London Borough of Camden within 7 days if asked. Unsatisfactory results add another: remedial work within 28 days — or sooner if the report says so — with written confirmation kept alongside the report.

The inspection

What the electrician actually tests

Expect the visit to be methodical: a visual inspection of the consumer unit, accessible wiring, sockets and switches first, then instrument testing of every circuit with the power isolated in turn. The electrician records results per circuit on the schedule of test results — the part of the report worth keeping safe — and classifies anything found from C1 (danger present) down to C3 (improvement recommended).

Credentials

Who you're letting in

The report is only as good as the person signing it. We book qualified electricians working to BS 7671 — typically registered with a recognised scheme such as NICEIC or NAPIT — with test instruments in calibration and insurance in place. Ask any inspector for their qualifications and scheme card; competent ones expect the question.

The law

What the law asks of landlords in Camden

In England the Electrical Safety Standards Regulations 2020 require a satisfactory EICR at least every 5 years, with local authorities like London Borough of Camden able to fine up to £30,000 per breach. Scotland folds the same 5-year cycle into the Repairing Standard; Wales requires it under the Renting Homes framework. Northern Ireland currently imposes no equivalent general duty on private lets.

England
Electrical Safety Standards in the Private Rented Sector (England) Regulations 2020
Private landlords must have the fixed electrical installation inspected and tested at least every 5 years by a qualified and competent person, give the report to tenants within 28 days (and to new tenants before they occupy), supply it to the council within 7 days if asked, and complete any remedial work within 28 days.
Scotland
Housing (Scotland) Act 2014 (Repairing Standard)
Private landlords must have an electrical safety inspection at least every 5 years, covering the installation and appliances the landlord provides.
Wales
Renting Homes (Wales) Act 2022 and associated fitness regulations
Landlords must obtain an electrical condition report at least every 5 years and give contract-holders a copy.
Northern Ireland
No equivalent general duty currently in force
There is no blanket 5-yearly EICR duty for private tenancies in Northern Ireland at present, though periodic inspection remains strongly recommended and may be required for HMOs.

Penalties stated are statutory maximums or court-set; London Borough of Camden is the local housing authority for Camden.

FAQ

What Camden landlords ask us

How long does an EICR take?

Usually 2 to 4 hours for a typical flat or house, longer for larger properties or older installations. Power is switched off circuit by circuit during testing, so tenants should expect short interruptions.

Is an EICR legally required for rentals in Camden?

In England, yes: private landlords must have a satisfactory EICR renewed at least every 5 years. Scotland requires an EICR as part of the Repairing Standard. In Wales, the Renting Homes (Wales) Act 2022 regime requires electrical safety testing at least every 5 years. Northern Ireland currently has no equivalent general duty for private tenancies, though safety obligations still apply.

What is an EICR?

An Electrical Installation Condition Report is a formal inspection of a property's fixed wiring — consumer unit, circuits, sockets, switches and light fittings — against the national wiring standard BS 7671. It records the installation's condition and classifies any defects.

What do the C1, C2, C3 and FI codes on an EICR mean?

C1 means danger present, immediate action required. C2 means potentially dangerous, remedial work needed. FI means further investigation required. C3 is an improvement recommendation only. A report with any C1, C2 or FI is unsatisfactory; C3s alone still pass.

What happens if my EICR is unsatisfactory?

In England you must complete the remedial work within 28 days (or sooner if the report says so) and obtain written confirmation from a qualified person, then supply it to the tenant and, if requested, to London Borough of Camden. Keep the confirmation with the report — together they evidence compliance.

My Camden property is a new build — do I still need an EICR?

A new installation comes with an Electrical Installation Certificate (EIC), which in England can stand in place of the first EICR for 5 years from installation. After that, the normal 5-year EICR cycle applies.

Nearby

Letting elsewhere close by? See: Islington · Westminster · Brent · Barnet · all of London

Tell us the postcode and what needs certifying; we'll handle the rest and keep the renewal on our calendar, not just yours. Check availability in Camden

Sorting your EICR (Electrical Safety Report) in Camden?

Tell us the property and we'll confirm coverage and price by email before anything is committed.

Register interest

Register interest — EICR (Electrical Safety Report)